Preparation of tender design & documents, project management and Contract administration of Pakpattan (2.82MW) Hydropower Project

Project Name:

Preparation of tender design & documents, project management and Contract administration of Pakpattan (2.82MW) Hydropower Project

Location Country/ Province/ Division:

RD 114+000, Pakpattan Canal , Punjab, Pakistan

Client:

Energy Department Government of Punjab

Implementation Start / Expected Completion:

May 2009 to June 2016

This is a run of river type hydropower project. The project site is located at RD 114+00 of Pakpattan Canal about 12km from Pakpattan Town. The powerhouse is located at the same RD approximately 500m in downstream of the existing fall structure at RD 112+350. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The owerhouse is containing two Horizontal Kaplan Turbines with a capacity of 3.2MW. The available design discharge is 84m3/s, and rated head net 4.53m. The total energy output will be 22.7 GWh and the implementation time is estimated as 52 month.