Technical, Engineering And Management Consultants
+92-42-35963495-96
banner

Pre-feasibility study and tentative design of Marala Hydropower Project (40MW)

Project Name:

Pre-feasibility study and tentative design of Marala Hydropower Project (40MW)

Location Country/ Province/ Division:

Marala Barrage, Sialkot, Punjab, Pakistan

Client:

Lucky Hydropower Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

A pre-feasibility study was prepared which include hydrology and power estimation and tentative layout planning. A tentative design of all civil structures was also prepared.