Hotreri Hydropower Project, Tariff Calculation, Detailed Design, Preparation of EPC Tender Documents and Construction Supervision (5.4 MW).

Project Name:

Hotreri Hydropower Project, Tariff Calculation, Detailed Design, Preparation of EPC Tender Documents and Construction Supervision (5.4 MW).

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan.

Client:

Ujala Hydel Power Company (Pvt) Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

May, 2006 to Continue

This is a run-of-river hydropower project located on the river Sehile Da Khata a right bank tributary of Jhelum River about 6 km from the town of Muzaffarabad, AJK, Pakistan. The feasibility study was carried out by Pakistan Engineering Services under the supervision of Technical Engineering Services Pakistan who worked as Owner Engineer. The project envisages a diversion weir at Sehile Da Khatha concrete power canal of 7 km length with discharge capacity of 1.16 m3/s. The project is also equipped with gravel and sand trap. Forebay is proposed at the end of power canal and house penstock intake. Penstck having dia of 0.65 m lead the water to powerhouse. Powerhouse is normal open type and house two numbers Pelton Turbine of 2.7 MW capacity each. The project is proposed to connected at Muzaffarabad (132 KV) through 33 KV Transmission line of 7 km length.