Technical, Engineering And Management Consultants
+92-42-35963495-96
banner

Feasibility Study of BS-I Link Hydropower Project (12.0MW)

Project Name:

Feasibility Study of BS-I Link Hydropower Project (12.0MW)

Location Country/ Province/ Division:

RD 106+250 of Balloki-Sulemanki Link I Canal in District (Chunian) Qasur, Punjab

Client:

Olympia Group

Implementation Start / Expected Completion:

March, 2008 to December, 2008

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.