Project Name:

Feasibility Study of Istaru Booni Hydropower Project (52MW)

Location Country/ Province/ Division:

District Chitral, KPK

Client:

Sarhad Hydel Development Organization

Implementation Start / Expected Completion:

June 2012 to December 2013

Scope of Services:

Preparation of Feasibility study. Study comprising of topographic survey, hydrology and sedimentation, engineering geology, frame work of investigation, evaluation of seismicity, assessment of environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis. Consultant also prepared PC-l Proforma for submission to Planning Commission of Pakistan for approval from ECNEC.

project image
project image
project image
project image

Project Name:

Feasibility Study of Gahrait Swir Lasht Hydropower Project (340MW)

Location Country/ Province/ Division:

District Chitral, KPK

Client:

Sarhad Hydel Development Organization

Implementation Start / Expected Completion:

June 2012 to July 2014

Scope of Services:

Preparation of Feasibility study comprising topographic survey, hydrology and sedimentation, engineering geology, frame work of investigation, evaluation of seismicity, assessment of environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis. Consultant also prepared the PC-1 Proforma for submission to Planning Commission of Pakistan for approval from ECNEC.

project image
project image
project image
project image
project image
project image
project image
project image

Project Name:

Feasibility Study of Lower Jhelum Canal Hydropower Project (4.8MW)

Location Country/ Province/ Division:

Mandibahuddin, Punjab, Pakistan.

Client:

Punjab Power Company (Pvt) Limited, Lahore, Pakistan

Implementation Start / Expected Completion:

July 2011 to July 2012

Scope of Services:

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.

project image
project image
project image
project image
project image
project image
project image

Project Name:

Feasibility Study of Hanzel Hydropower Project (20MW)

Location Country/ Province/ Division:

Hanzal at Gilgit River, Gilgit-Baltistan, Province of Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit-Baltistan

Implementation Start / Expected Completion:

July, 2008 to May, 2009

Scope of Services:

This is a run-of-river hydropower project located on the Gilgit River, a main tributary of Indus River about 11 km from Gilgit city, Northern Areas, Pakistan. Diversion weir is located near Harpoon village has three parts, fixed and lateral intake/low level flushing section. Low level flushing section is equipped with two gates of same size. Fixed weir and low level flushing section and water diverted to gated intake to connecting channel to forebay and then to power channel. Total length of power channel is 5.1 km and rated head is 62.8 m and discharge 38 m3/s with installed capacity of 20 MW energy studies were made and annual energy delivery to the grid is 171.48 GWh per year.

project image
project image
project image
project image

Project Name:

Feasibility Study of BS-I Link Hydropower Project (12.0MW)

Location Country/ Province/ Division:

RD 106+250 BS I Link, Chunian, Punjab, Pakistan.

Client:

Olympia Group

Implementation Start / Expected Completion:

March, 2008 to May, 2009

Scope of Services:

This is a run-of-river hydropower project located on the BS I Link canal at RD 106+250, near Chunian City.
The preliminary studies of the project had been carried out by GTZ/HEPO-WAPDA and MK Power. The project envisages powerhouse will be constructed within canal and equipped with three pit type turbines. The available discharge is 425 cumecs and Head is 3.24 meter. Total energy will be 79 GWh. M/s TEAM Consultants has been contracted to review the general layout of the scheme and particularly to review the hydrology, hydraulics, geology, geotechnics, structural and Electro-Mechanical Equipments for feasibility design.

project image
project image
project image
project image
project image
project image
project image

Project Name:

Darmodar Hydropower Project, Feasibility Study (2.0MW).

Location Country/ Province/ Division:

Darmodar valley, Northern Areas, District Gizer, Pakistan.

Client:

Water and Power Department Northern Areas, Gahkuch, Pakistan

Implementation Start / Expected Completion:

June, 2007 to September, 2007

Scope of Services:

This is a run-of-river hydropower project located on the Darmodar River, a left bank tributary of Gilgit River near Gahkuch city, Northern Areas, Pakistan. Preliminary studies of Darmodar was carried out by GTZ/HEPO WAPDA.The project envisages a Tyrolean type diversion weir across Darmodar Gah which diverts water in to concrete lined power canal of 620 m length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 263m steel Penstock link the forebay and powerhouse. The discharge and head is 2 m3/s and 145 m, respectively. The powerhouse is open type and will house two numbers Pelton wheel. The project will be connected to local network

project image
project image
project image
project image

Project Name:

Hotreri Hydropower Project, Review and Supervision of Feasibility Study (5.4MW).

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan.

Client:

Ujala Hydel Power Company (Pvt) Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

December, 2004 to January, 2006

Scope of Services:

This is a run-of-river hydropower project located on the river Sehile Da Khata a right bank tributary of Jhelum River about 6 km from the town of Muzaffarabad, AJK, Pakistan. The preliminary studies of the project had previously been carried out by GTZ and HEPO-WAPDA. The Feasibility study was carried out by Pakistan Engineering Services under the supervision of Technical Engineering Services Pakistan who worked as Owner Engineer. The project envisages a diversion weir at Sehile Da Khatha and concrete lined power canal of 7 km length with 1.2 m3/s design discharge. The project is also equipped with gravel and sand trap. The power canal end into forebay which is equipped with side spill weir and penstock. A 1.3 km lengthy steel Penstock link the forebay and powerhouse. The powerhouse is open type and will house two number pelton wheel having capacity of 2.7 MW each. The project will be connected to National Grid at Muzaffarabad (132 KV) through 33KV Transmission line of 7 km length.

Project Name:

Nalter-V Hydropower Project, Feasibility Study (14 MW).

Location Country/ Province/ Division:

Nalter valley, Northern Areas, Gilgit, Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit, Pakistan

Implementation Start / Expected Completion:

July, 2006 to January 2016

Scope of Services:

This is a run-of-river hydropower project located on the Nalter river, a left bank tributary of Hunza River near Gilgit city, Northern Areas, Pakistan. Preliminary studies of Nalter -V was first mentioned as part of the master plan for electrification of Northern Areas of Pakistan on the basis of proximity power. The project envisages a Tyrolean type diversion weir across Nalter Gah which diverts water in to concrete lined power canal of 450 m length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 4.12 km steel Penstock link the forebay and powerhouse. The discharge and head is 9.45 m3/s and 309.75 m, respectively. The powerhouse is open type and will house three numbers Pelton wheel. The project will be connected to local network

project image
project image
project image
project image
project image
project image
project image
project image

Project Name:

Feasibility Study of Nalter-III Hydropower Project (16MW)

Location Country/ Province/ Division:

Nalter valley, Gilgit-Baltistan, Gilgit, Pakistan

Client:

Water and Power Department Gilgit-Baltistan, Gilgit, Pakistan

Implementation Start / Expected Completion:

July 2006 to January 2008

Scope of Services:

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.

project image
project image
project image
project image

Project Name:

Sangab Hydropower Project, Detailed Engineering Design and Estimation of quantities (127 KW).

Location Country/ Province/ Division:

Badkshan Province, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

Scope of Services:

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The power canal already exists while weir, forebay, powerhouse and tailrace will have to be constructed. The feasibility study was prepared by Intgeration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages a diversion 0.3 m3/s of water into power canal already exists. The net of 57.3 m will be generated through 491 m long head race. One Francis turbine with 127 KW capacity will be installed. A steel penstock having 0.5 m diameter and 105 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.

project image
project image
project image
project image

Project Name:

Jurm Hydropower Project, Detailed Engineering Design and Estimation of quantities (440 KW).

Location Country/ Province/ Division:

Badkhsan Province, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

Scope of Services:

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The power canal already exists and weir, forebay, powerhouse and tailrace will have to be constructed. The feasibility study was prepared by Intgeration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages a diversion 0.9 m3/s of water in to power canal. The net of 61.5 m will be generated through 1150 m long head race. Two Francis turbines with 220 KW capacity each shall be installed. A steel penstock having 0.7 m diameter and 130 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.

project image
project image
project image
project image

Project Name:

Riali-I Hydropower Project, Review and Up-dation of Feasibility Study and Tariff Calculation (1.5MW).

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan.

Client:

Ashabah Powers Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

February, 2006 to July, 2006

Scope of Services:

This is a run-of-river hydropower project located on the river Ghoriwala Khata a right bank tributary of Neelum River about 8 km from the town of Muzaffarabad, AJK, Pakistan. The preliminary studies of the project had previously been carried out by GTZ and HEPO-WAPDA. The Feasibility study was carried out by Associated Engineering Consultants Islamabad Pakistan. The project envisages a tirolean type diversion weir along Ghoriwala Nullah which diverts water in to concrete lined power canal of 2 km length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 250 m lengthy steel Penstock link the forebay and powerhouse. The discharge and head is 1.5 m3/s and 139.24 m, respectively. The powerhouse is open type and will house two numbers Pelton wheel having capacity 0.6 MW each. The project will be connected to National Grid at Muzaffarabad (132 KV) through 11KV Transmission line of 10 km length.

project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image

Project Name:

Pre-feasibility study and tentative design of Marala Hydropower Project (40MW)

Location Country/ Province/ Division:

Marala Barrage, Sialkot, Punjab, Pakistan

Client:

Lucky Hydropower Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

Scope of Services:

A pre-feasibility study was prepared which include hydrology and power estimation and tentative layout planning. A tentative design of all civil structures was also prepared.

Project Name:

Feasibility Study of Marala-Ravi Link 16.5MW Hydropower Project

Location Country/ Province/ Division:

RD 315+500 Maral-Ravi Link in District Narowal

Client:

Mr. Power Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

Scope of Services:

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.

project image
project image
project image
project image
project image
project image
project image
project image
project image
project image
project image

Project Name:

Feasibility Study of Gugera Canal Hydropower Project (3.6MW)

Location Country/ Province/ Division:

Nankana, Punjab, Pakistan.

Client:

Punjab Power Company (Pvt) Limited, Lahore, Pakistan

Implementation Start / Expected Completion:

July 2014 to December 2015

Scope of Services:

Initially ranking of 10 indentified sites was prepared by Hydro Electric Planning Organization (HEPO) WAPDA under technical collaboration with German Agency for Technical assistance (GTZ) also prepared inventory of hydel potential along existing irrigation system (including canals and barrages) of Pakistan. Out of these sites, M/s Survey Links selected the sites of RD 216+100 and RD 220+750 of Upper Gugera Branch (UGB) for their development and engaged the services of M/s Technical, Engineering and Management (TEAM) Consultants, Pakistan former Technical and Engineering Services for preparation of conceptual pre-feasibility level design required for issuance of Letter of Interest (LOI) by the Punjab Power Development Board.