Jurm Hydropower Project, Detailed Engineering Design and Estimation of quantities (440 KW).

Project Name:

Jurm Hydropower Project, Detailed Engineering Design and Estimation of quantities (440 KW).

Location Country/ Province/ Division:

Badkhsan Province, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The power canal already exists and weir, forebay, powerhouse and tailrace will have to be constructed. The feasibility study was prepared by Intgeration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages a diversion 0.9 m3/s of water in to power canal. The net of 61.5 m will be generated through 1150 m long head race. Two Francis turbines with 220 KW capacity each shall be installed. A steel penstock having 0.7 m diameter and 130 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.