BS I Link Hydropower Project, Feasibility Study Design (12 MW).

Project Name:

BS I Link Hydropower Project, Feasibility Study Design (12 MW).

Location Country/ Province/ Division:

RD 106+250 BS I Link, Chunian, Punjab, Pakistan.

Client:

Olympia Group

Implementation Start / Expected Completion:

March, 2008 to May, 2009

This is a run-of-river hydropower project located on the BS I Link canal at RD 106+250, near Chunian City.
The preliminary studies of the project had been carried out by GTZ/HEPO-WAPDA and MK Power. The project envisages powerhouse will be constructed within canal and equipped with three pit type turbines. The available discharge is 425 cumecs and Head is 3.24 meter. Total energy will be 79 GWh. M/s TEAM Consultants has been contracted to review the general layout of the scheme and particularly to review the hydrology, hydraulics, geology, geotechnics, structural and Electro-Mechanical Equipments for feasibility design.