Preparation of tender design & documents, project management and Contract administration of Pakpattan (2.82MW) Hydropower Project

Project Name:

Preparation of tender design & documents, project management and Contract administration of Pakpattan (2.82MW) Hydropower Project

Location Country/ Province/ Division:

RD 114+000, Pakpattan Canal , Punjab, Pakistan.

Client:

Irrigation & Power Department Government of Pakistan.

Implementation Start / Expected Completion:

May, 2009 to September, 2013

This is a run of river type hydropower project. The project site is located at RD 114+00 of Pakpattan Canal about 12km from Pakpattan Town. The powerhouse is located at the same RD approximately 500m in downstream of the existing fall structure at RD 112+350. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The owerhouse is containing two Horizontal Kaplan Turbines with a capacity of 3.2MW. The available design discharge is 84m3/s, and rated head net 4.53m. The total energy output will be 22.7 GWh and the implementation time is estimated as 52 month.