Technical, Engineering And Management Consultants
+92-42-35963495-96
banner

Feasibility Study of Marala-Ravi Link 16.5MW Hydropower Project

Project Name:

Feasibility Study of Marala-Ravi Link 16.5MW Hydropower Project

Location Country/ Province/ Division:

RD 315+500 Maral-Ravi Link in District Narowal

Client:

Mr. Power Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.