Technical, Engineering And Management Consultants
+92-42-35963495-96
banner

Hydro Power Projects (Completed)

Project Name:

Construction of 14MW Nalter-V Hydropower Project,

Location Country/ Province/ Division:

Nalter valley, Northern Areas, Gilgit, Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit, Pakistan

Implementation Start / Expected Completion:

December, 2010 to 2016

Scope of Services:

This is a run-of-river hydropower project located on the Nalter river, a left bank tributary of Hunza River near Gilgit city, Northern Areas, Pakistan. Preliminary studies of Nalter -V was first mentioned as part of the master plan for electrification of Northern Areas of Pakistan on the basis of proximity power. The project envisages a Tyrolean type diversion weir across Nalter Gah which diverts water in to concrete lined power canal of 450 m length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 4.12 km steel Penstock link the forebay and powerhouse. The discharge and head is 9.45 m3/s and 309.75 m, respectively. The powerhouse is open type and will house three numbers Pelton wheel. The project will be connected to local network

Project Name:

Hotreri Hydropower Project, Review and Supervision of Feasibility Study (5.4MW).

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan.

Client:

Ujala Hydel Power Company (Pvt) Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

December, 2004 to January, 2006

Scope of Services:

This is a run-of-river hydropower project located on the river Sehile Da Khata a right bank tributary of Jhelum River about 6 km from the town of Muzaffarabad, AJK, Pakistan. The preliminary studies of the project had previously been carried out by GTZ and HEPO-WAPDA. The Feasibility study was carried out by Pakistan Engineering Services under the supervision of Technical Engineering Services Pakistan who worked as Owner Engineer. The project envisages a diversion weir at Sehile Da Khatha and concrete lined power canal of 7 km length with 1.2 m3/s design discharge. The project is also equipped with gravel and sand trap. The power canal end into forebay which is equipped with side spill weir and penstock. A 1.3 km lengthy steel Penstock link the forebay and powerhouse. The powerhouse is open type and will house two number pelton wheel having capacity of 2.7 MW each. The project will be connected to National Grid at Muzaffarabad (132 KV) through 33KV Transmission line of 7 km length.

Project Name:

Chatta Hydropower Project, Detailed Engineering Design and Estimation of quantities (111 KW).

Location Country/ Province/ Division:

Badkshan Provine, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

Scope of Services:

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The project consists of weir, power canal, forebay, powerhouse and tailrace. The feasibility study was prepared by Integration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages diversion 0.3 m3/s of water into power canal. The net of 24.7 m will be generated through 268.92 m long head race. One Francis turbines with 111 KW capacity will be installed. A steel penstock having 0.5 m diameter and 95 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.

Project Name:

Riali-I Hydropower Project, Review and Up-dation of Feasibility Study and Tariff Calculation (1.5MW).

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan.

Client:

Ashabah Powers Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

February, 2006 to July, 2006

Scope of Services:

This is a run-of-river hydropower project located on the river Ghoriwala Khata a right bank tributary of Neelum River about 8 km from the town of Muzaffarabad, AJK, Pakistan. The preliminary studies of the project had previously been carried out by GTZ and HEPO-WAPDA. The Feasibility study was carried out by Associated Engineering Consultants Islamabad Pakistan. The project envisages a tirolean type diversion weir along Ghoriwala Nullah which diverts water in to concrete lined power canal of 2 km length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 250 m lengthy steel Penstock link the forebay and powerhouse. The discharge and head is 1.5 m3/s and 139.24 m, respectively. The powerhouse is open type and will house two numbers Pelton wheel having capacity 0.6 MW each. The project will be connected to National Grid at Muzaffarabad (132 KV) through 11KV Transmission line of 10 km length.

Project Name:

Jurm Hydropower Project, Detailed Engineering Design and Estimation of quantities (440 KW).

Location Country/ Province/ Division:

Badkhsan Province, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

Scope of Services:

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The power canal already exists and weir, forebay, powerhouse and tailrace will have to be constructed. The feasibility study was prepared by Intgeration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages a diversion 0.9 m3/s of water in to power canal. The net of 61.5 m will be generated through 1150 m long head race. Two Francis turbines with 220 KW capacity each shall be installed. A steel penstock having 0.7 m diameter and 130 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.

Project Name:

Sangab Hydropower Project, Detailed Engineering Design and Estimation of quantities (127 KW).

Location Country/ Province/ Division:

Badkshan Province, Afghanistan.

Client:

Power Department Afghanistan

Implementation Start / Expected Completion:

May, 2006 to September, 2006

Scope of Services:

This is a run-of-river hydropower project located in Badakshan Province of Afghanistan. The power canal already exists while weir, forebay, powerhouse and tailrace will have to be constructed. The feasibility study was prepared by Intgeration and Environment, Gmbh, Germany under grant arrangement from German Government. The project envisages a diversion 0.3 m3/s of water into power canal already exists. The net of 57.3 m will be generated through 491 m long head race. One Francis turbine with 127 KW capacity will be installed. A steel penstock having 0.5 m diameter and 105 m length join the forebay and powerhouse. The project is proposed to be operated in Isolated mod.

Project Name:

Nalter-V Hydropower Project, Feasibility Study (14 MW).

Location Country/ Province/ Division:

Nalter valley, Northern Areas, Gilgit, Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit, Pakistan

Implementation Start / Expected Completion:

July, 2006 to January 2016

Scope of Services:

This is a run-of-river hydropower project located on the Nalter river, a left bank tributary of Hunza River near Gilgit city, Northern Areas, Pakistan. Preliminary studies of Nalter -V was first mentioned as part of the master plan for electrification of Northern Areas of Pakistan on the basis of proximity power. The project envisages a Tyrolean type diversion weir across Nalter Gah which diverts water in to concrete lined power canal of 450 m length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 4.12 km steel Penstock link the forebay and powerhouse. The discharge and head is 9.45 m3/s and 309.75 m, respectively. The powerhouse is open type and will house three numbers Pelton wheel. The project will be connected to local network

Project Name:

Nalter-III Hydropower Project, Review and Up-date of Feasibility Study (18MW)

Location Country/ Province/ Division:

Nalter valley, Northern Areas, Gilgit, Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit, Pakistan

Implementation Start / Expected Completion:

July, 2006 to April, 2007

Scope of Services:

This is a run-of-river hydropower project located on the Nalter river, a left bank tributary of Hunza River near Gilgit city, Northern Areas, Pakistan. The preliminary studies of the project had previously been carried out by GTZ and HEPO-WAPDA. The Feasibility study was carried out by HEPO-WAPDA and published in 2001.The project envisages a tirolean type diversion weir across Nalter Gah which diverts water in to concrete lined power canal of 3.5 km length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 1.15 km steel Penstock link the forebay and powerhouse. The discharge and head is 9.45 m3/s and 361.95 m, respectively. The powerhouse is open type and will house three numbers Pelton wheel. The project will be connected to Local network

Project Name:

Alipur Hydropower Project, Prefeasibility Study Report (7.0 MW).

Location Country/ Province/ Division:

RD 271+654 QB Link, Qadirabad-Balloki, Punjab, Pakistan.

Client:

M/S Din Power Private Limited

Implementation Start / Expected Completion:

December, 2007 to March, 2008

Scope of Services:

During this study it reveals that development of a hydel project by utilizing the fall available at RD 271+654 and RD 304+984 was considered by combining the head available at two sites. The proposed project is located at RD 276+861 downstream of RD 271+654. The location selected on the basis of desk studies. The discharge available is 527 m3/s and gross head 2.54 m. Having a plant capacity of 7.0 MW with available energy generation of 54.75 GWh, an estimated plant factor is 89.3 %. The powerhouse will be constructed in by-pass arrangement. Four Pit type Kaplan double regulated turbines are selected. The power plant will be equipped with necessary electrical and mechanical equipment required for safe and robust operation.

Project Name:

Darmodar Hydropower Project, Feasibility Study (2.0MW).

Location Country/ Province/ Division:

Darmodar valley, Northern Areas, District Gizer, Pakistan.

Client:

Water and Power Department Northern Areas, Gahkuch, Pakistan

Implementation Start / Expected Completion:

June, 2007 to September, 2007

Scope of Services:

This is a run-of-river hydropower project located on the Darmodar River, a left bank tributary of Gilgit River near Gahkuch city, Northern Areas, Pakistan. Preliminary studies of Darmodar was carried out by GTZ/HEPO WAPDA.The project envisages a Tyrolean type diversion weir across Darmodar Gah which diverts water in to concrete lined power canal of 620 m length. The gravel and sand trap is also provided. The forebay is provided at the end of power canal. A 263m steel Penstock link the forebay and powerhouse. The discharge and head is 2 m3/s and 145 m, respectively. The powerhouse is open type and will house two numbers Pelton wheel. The project will be connected to local network

Project Name:

3.0 MW Gugera Hydropower Project, Pre Feasibility Study

Location Country/ Province/ Division:

RD 216+100 Upper Gugera Branch Punjab Pakistan.

Client:

M/S Svvy Links

Implementation Start / Expected Completion:

March, 2008 to December, 2008

Scope of Services:

Initially ranking of 10 indentified sites was prepared by Hydro Electric Planning Organization (HEPO) WAPDA under technical collaboration with German Agency for Technical assistance (GTZ) also prepared inventory of hydel potential along existing irrigation system (including canals and barrages) of Pakistan. Out of these sites, M/s Survey Links selected the sites of RD 216+100 and RD 220+750 of Upper Gugera Branch (UGB) for their development and engaged the services of M/s Technical, Engineering and Management (TEAM) Consultants, Pakistan former Technical and Engineering Services for preparation of conceptual pre-feasibility level design required for issuance of Letter of Interest (LOI) by the Punjab Power Development Board.

Project Name:

BS I Link Hydropower Project, Feasibility Study Design (12 MW).

Location Country/ Province/ Division:

RD 106+250 BS I Link, Chunian, Punjab, Pakistan.

Client:

Olympia Group

Implementation Start / Expected Completion:

March, 2008 to May, 2009

Scope of Services:

This is a run-of-river hydropower project located on the BS I Link canal at RD 106+250, near Chunian City.
The preliminary studies of the project had been carried out by GTZ/HEPO-WAPDA and MK Power. The project envisages powerhouse will be constructed within canal and equipped with three pit type turbines. The available discharge is 425 cumecs and Head is 3.24 meter. Total energy will be 79 GWh. M/s TEAM Consultants has been contracted to review the general layout of the scheme and particularly to review the hydrology, hydraulics, geology, geotechnics, structural and Electro-Mechanical Equipments for feasibility design.

Project Name:

20 MW Hanzel Hydropower Project, Feasibility Study.

Location Country/ Province/ Division:

Hanzel at Gilgit River, Northern Areas, Pakistan.

Client:

Water and Power Department Northern Areas, Gilgit, Pakistan

Implementation Start / Expected Completion:

July, 2008 to May, 2009

Scope of Services:

This is a run-of-river hydropower project located on the Gilgit River, a main tributary of Indus River about 11 km from Gilgit city, Northern Areas, Pakistan. Diversion weir is located near Harpoon village has three parts, fixed and lateral intake/low level flushing section. Low level flushing section is equipped with two gates of same size. Fixed weir and low level flushing section and water diverted to gated intake to connecting channel to forebay and then to power channel. Total length of power channel is 5.1 km and rated head is 62.8 m and discharge 38 m3/s with installed capacity of 20 MW energy studies were made and annual energy delivery to the grid is 171.48 GWh per year.

Project Name:

Preparation of tender design & documents, project management and Contract administration of Chianwali (5.38MW) Hydropower Project

Location Country/ Province/ Division:

RD 130+000, Uper Chenab Canal Lower, Punjab, Pakistan.

Client:

Irrigation & Power Department Government of Pakistan.

Implementation Start / Expected Completion:

May, 2009 to June 2016

Scope of Services:

This is a run of river type hydropower project. The project site is located at RD 130+000 of Upper Chenab Canal Lower approximately 600 in downstream of existing fall structure at RD 128+00 in the bed of the canal towards the left bank of the canal and about 8 km from Gujranwala Town. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The powerhouse is equipped with two Horizontal Kaplan Turbines with a capacity of 5.4MW. The available design discharge is 150m3/s, and rated head net 4.3m. The total energy output will be 32.7 GWh and the implementation time is estimated as 52 month.

Project Name:

Preparation of tender design & documents, project management and Contract administration of Pakpattan (2.82MW) Hydropower Project

Location Country/ Province/ Division:

RD 114+000, Pakpattan Canal , Punjab, Pakistan.

Client:

Irrigation & Power Department Government of Pakistan.

Implementation Start / Expected Completion:

May, 2009 to September, 2013

Scope of Services:

This is a run of river type hydropower project. The project site is located at RD 114+00 of Pakpattan Canal about 12km from Pakpattan Town. The powerhouse is located at the same RD approximately 500m in downstream of the existing fall structure at RD 112+350. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The owerhouse is containing two Horizontal Kaplan Turbines with a capacity of 3.2MW. The available design discharge is 84m3/s, and rated head net 4.53m. The total energy output will be 22.7 GWh and the implementation time is estimated as 52 month.

Project Name:

Preparation of tender design & documents, project management and Contract administration of Marala (7.64MW) Hydropower Project

Location Country/ Province/ Division:

RD 2+500, Uper Chenab Canal Main Marala, Punjab, Pakistan.

Client:

Irrigation & Power Department Government of Pakistan.

Implementation Start / Expected Completion:

May, 2009 to June 2016

Scope of Services:

This is a run of river type hydropower project. The project site is located at RD 2+500 of Upper Chenab Canal Main approximately 760 Meter downstream of the existing head regulator at RD 0+300 & about 25 km from Sialkot Town. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. Powerhouse is equipped with four Horizontal Kaplan Turbines with a combined capacity of 7.2MW. The available design discharge is 350m3/s, and rated head net 2.56m. The total energy output will be 48.52 GWh and the implementation time is estimated as 52 months.

Project Name:

Preparation of tender design & documents, project management and Contract administration of Deg Outfall (4.04MW) Hydropower Project

Location Country/ Province/ Division:

RD 282+225, Uper Chenab Canal Lower, Punjab, Pakistan.

Client:

Irrigation & Power Department Government of Pakistan.

Implementation Start / Expected Completion:

May, 2009 to June, 2016

Scope of Services:

This is a run of river type hydropower project. The project site is located at RD 283+100 of Upper Chenab Canal Lower about 6km from Lahore Faisalabad Road and 19km from Sheikupura. The powerhouse is located at RD 282+225 approximately 400m in Upstream of the existing fall structure at RD 283+100 in the bed of the canal towards the right bank of the canal. The powerhouse & spillway is placed adjacently along the same axis & will be constructed in the By Pass. The powerhouse is equipped with two Horizontal Kaplan Turbines with a capacity of 5.0MW. The available design discharge is 150m3/s, and rated head net 4.02m. The total energy output will be 29.13 GWh and the implementation time is estimated as 52 months.

Project Name:

Gahrait Swir Lasht Hydropower Project (52MW)

Location Country/ Province/ Division:

District Chitral, KPK

Client:

Sarhad Hydel Development Organization

Implementation Start / Expected Completion:

June, 2012 to July, 2014

Scope of Services:

The hydropower site was identified during the identification of hydel potential in Northern areas of KPK by SHYDO/GTZ.
Technical Details of the scheme are:
P = 52MW, Q = 70 m3/sec, H = 100m, Ea = 213GWh
The scheme is located at Turkho River about 2 km downstream of Istaru Village. This river joins with mastuj River about 10 km downstream of Booni Town.

Project Name:

Istaru Booni Hydropower Project (340 MW)

Location Country/ Province/ Division:

District Chitral, KPK

Client:

Sarhad Hydel Development Organization

Implementation Start / Expected Completion:

June, 2012 to December, 2013

Scope of Services:

The hydropower site was identified during the identification of hydel potential in Northern areas of KPK by SHYDO/GTZ.
Technical Details of the scheme are:
P = 340MW, Q = 410 m3/sec, H = 125m, Ea = 1553Wh
The scheme is located at Chitral River about 35 km downstream of Chitral Town. The project layout is proposed on the right bank of Chitral River with the powerhouse site about 8km downstream of Drosh town near Swir Lasht village.

Project Name:

3.0 MW Gugera Hydropower Project, Pre Feasibility Study

Location Country/ Province/ Division:

RD 216+100 Upper Gugera Branch Punjab Pakistan.

Client:

M/S Svvy Links

Implementation Start / Expected Completion:

March, 2008 to December, 2008

Scope of Services:

Initially ranking of 10 indentified sites was prepared by Hydro Electric Planning Organization (HEPO) WAPDA under technical collaboration with German Agency for Technical assistance (GTZ) also prepared inventory of hydel potential along existing irrigation system (including canals and barrages) of Pakistan. Out of these sites, M/s Survey Links selected the sites of RD 216+100 and RD 220+750 of Upper Gugera Branch (UGB) for their development and engaged the services of M/s Technical, Engineering and Management (TEAM) Consultants, Pakistan former Technical and Engineering Services for preparation of conceptual pre-feasibility level design required for issuance of Letter of Interest (LOI) by the Punjab Power Development Board.

Project Name:

Feasibility Study of Marala-Ravi Link 16.5MW Hydropower Project

Location Country/ Province/ Division:

RD 315+500 Maral-Ravi Link in District Narowal

Client:

Mr. Power Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

Scope of Services:

Preparation of Feasibility study. Study included investigation in the field of topographic, hydrographic survey, geologic mapping, drilling and pitting, environmental and social investigation and survey. To complete the study following field were studied in detailed such as; hydrology and sedimentation, engineering geology, seismicity, environmental and social impacts, design and layouts of structures, development of construction plan, calculate benefits of project and economic analysis.

Project Name:

Pre-feasibility study and tentative design of Marala Hydropower Project (40MW)

Location Country/ Province/ Division:

Marala Barrage, Sialkot, Punjab, Pakistan

Client:

Lucky Hydropower Company Lahore, Pakistan

Implementation Start / Expected Completion:

May, 2006 July, 2006

Scope of Services:

A pre-feasibility study was prepared which include hydrology and power estimation and tentative layout planning. A tentative design of all civil structures was also prepared.

Project Name:

Review and updation of cost Riali-I Hydropower Project (1.5MW)

Location Country/ Province/ Division:

District Muzaffarabad, AJK, Pakistan

Client:

Ashabah Powers Limited, Islamabad, Pakistan

Implementation Start / Expected Completion:

February, 2006 July, 2006

Scope of Services:

Review and updation of cost worked out during feasibility study. Assignment also include tariff determination and calculation

Project Name:

Preparation of detailed engineering design and quantities estimation of Jurm

Location Country/ Province/ Division:

Badkshan Province, Afghanistan

Client:

Power Department, Afghanistan

Implementation Start / Expected Completion:

May, 2006 Sep, 2006

Scope of Services:

Preparation of detailed engineering design and quantities estimation of the project for all civil engineering components of the project. Client was M/S Integration and Environment of Germany.

Project Name:

Preparation of detailed engineering design and quantities estimation of Sangab Hydropower Project

Location Country/ Province/ Division:

Badkshan Province, Afghanistan

Client:

Breshina, Afghanistan

Implementation Start / Expected Completion:

May, 2006 to Sep 2006

Scope of Services:

Preparation of detailed engineering design and quantities estimation of the project for all civil engineering components of the project. Client was M/S Integration and Environment of Germany.